Carl's Railway Photos

31st January 2013 - Eastleigh Works

455828 is mid-way through refurbishment and the vehicles are swapped around in the shed
 

28th January 2013 - Eastleigh Works

70009 arrives on the trip from Maritime
73212 arrives with a GLV for re-supplying
 

25th January 2013 - Harman's Cross

The Swanage Railway's DMU Collection

(Photos taken with permission)

 

 

25th January 2013 - Norden

33034 awaits the last rites
 

24th January 2013 - Eastleigh Works

31190 hauls away 'DUKE OF GLOUCESTER'
Stoneblower DR80206 is repainted
 

23rd January 2013 - Eastleigh Works

455828 is the latest in for overhaul
450112 is up on the jacks
 

21st January 2013 - Eastleigh Works

57312 and 73204 top 'n' tail a GLV
455819 is almost ready to leave
450545 is on the jacks
'DUKE OF GLOUCESTER' is inside being prepared to leave
 

18th January 2013 - Eastleigh Works

The day it snowed!
57303 and 57312 top 'n' tail a Snow & Ice Treatment Train (SITT)
 

17th January 2013 - Eastleigh Works

DLR Engineers wagon 98 has arrived for overhaul
Niteq B168 is scrapped
 

16th January 2013 - Eastleigh Works

73119 and 73206 replace 57303 and 57312 on a Test Train
 

15th January 2013 - Eastleigh Works

66743 arrives with 73206, GLV 68504 and 73119
450116 is the latest unit receiving attention from Siemens
The DRS Mk2 overhaul project is progressing well
 

14th January 2013 - Eastleigh Works

DLR Engineers Wagon 996 departs
66501 is on the Freightliner Trip
450564 is ready to leave
 

9th January 2013 - Eastleigh Works

66719 prepares to depart with the Arlington liveried Translators
 

8th January 2013 - Eastleigh Works

Stoneblower DR80215 is repainted and DR80206 is next in line
450109 prepares to depart after 450563 arrives
 

4th January 2013 - Eastleigh Works

47818 has arrived to collect repainted 57010 and 57307
66718 has arrived for fuel tank repairs
31465 is stabled on a Test Train
57303 and 57312 arrived back the previous evening
455809 is out on test on the 3rd rail
 

3rd January 2013 - Eastleigh Works

57307 is pulled out for a quick photo
The Speno Rail Grinder is ready to leave
 

2nd January 2013 - Eastleigh Works

The nameplates are refitted to 57307
455809 is almost completed
Stoneblower DR80215 is rubbed down in the Paintshop

Archive

Home

January 2013