Carl's Railway Photos

29th January 2014 - Eastleigh Works

Loram Rail Grinder (DR79251-257) is in for repairs
66532 has arrived for repairs
07007 is busy shunting the stored TDA wagons
 

27th January 2014 - Eastleigh Works

47818 is in the Paintshop for a coat of DRS blue
450025 is the latest arrival with 450095 ready to depart, 450097 has moved over for the interior work to be done
Rail Grinder DR79267/277 is almost ready to leave
More Coil Carriers are in the Scrap Line
 

23rd January 2014 - Eastleigh Works

The track outside the Cleaning House (Bosh Shop) is cleared for work to assess what needs to be done to make it suitable for the Diesel Loco Servicing Shed that Arlington are creating there
 

21st January 2014 - Eastleigh Works

57303 is lifted
455845 has arrived for overhaul
 

20th January 2014 - Eastleigh Works

01508 now sports numbers and the new Arlington Fleet Group logo
66534 is on the Maritime trip
455846 is ready for departure
 

17th January 2014 - Eastleigh Works

AIT cars 3079 and 3179 are in the Paintshop
47739 arrives to collect Translators for another 458/5 move
More coil carriers have been put in the scrap line
Arlington are building a new pit in the old Cleaning House as part of the creation of a dedicated diesel loco servicing shed
 

17th January 2014 - Eastleigh

33029 passes with a crane
60015 passes with an intermodal
 

15th January 2014 - Eastleigh Works

ED Fest!
73201 has replaced 73138 on the Test Train
73109 and 73213 arrive for repairs
 

13th January 2014 - Eastleigh Works

73138 and 73107 top 'n' tail a Test Train
 

9th January 2014 - Eastleigh Works

Powerhaul liveried 66504 is on the Maritime trip
31105 is stabled with a Test Train, including
recently converted UTU2 vehicle 62287
 

8th January 2014 - Eastleigh Works

66712 is painted and awaits refitting of windows and grilles
07007 makes a rare appearance round the back
The AIT cars are being shunted round the front
 

3rd January 2014 - Eastleigh Works

4-CEP vehicles 61229 and 61230 arrive with VSOE 99545,
behind 33029
66846 is completed and ready to leave
455846 has arrived for overhaul
 

2nd January 2014 - Eastleigh Works

Modifications to AIT car 3179 are well underway

Archive

Home

January 2014