30th November 2015 - Arlington Eastleigh Works |
|
08721 is loaded for delivery to Wembley | |
28th November 2015 - Crewe |
|
A quartet of 66s, DB Management 67 and a repainted 90 plus all the usual units, including a few advertising liveries |
|
27th November 2015 - Arlington Eastleigh Works |
|
73128 is already being prepared for repainting 08947 is now in blue with black stripes on the rear 37175 is stabled with a Test Train |
|
25th November 2015 - Arlington Eastleigh Works |
|
08721 is finished, now sporting black stripes front and rear 66731 arrives with 73128, two RHTT wagons and seven SITT wagons 50021 and 50026 are outside while Bay 5 is shunted |
|
23rd November 2015 - Arlington Eastleigh Works |
|
08947 now has yellow ends 66713 collects 73107 66711 and 66758 are on site for minor repairs |
|
20th November 2015 - Arlington Eastleigh Works |
|
The Swanage Railway Project Wareham DMUs are progressing well with 55028 having repairs to one cab roof 08947 and 08721 are swapped round in the Paintshop, giving the first proper look at finished 08721 |
|
19th November 2015 - Arlington Eastleigh Works |
|
08947 is cleaned prior to going back into the Paintshop 57311 arrived with some PFA wagons |
|
18th November 2015 - Arlington Eastleigh Works |
|
08721 has the black stripes applied 08947 has some weld repairs Signwriting of Generator Car 6313 is underway by Gerald Whittaker |
|
16th November 2015 - Arlington Eastleigh Works |
|
73107 has new wheels and traction motors and is ready to leave | |
13th November 2015 - Arlington Eastleigh Works |
|
08947 is in the Paintshop The new loadbank is now painted Arlington green |
|
13th November 2015 - Eastleigh |
|
GBRf rebuild 73961 departs the depot, within 100 yards of RVEL rebuild 73951! Still waiting for a side by side shot! | |
12th November 2015 - Arlington Eastleigh Works |
|
57003 and 57309 depart with two PFAs | |
10th November 2015 - Arlington Eastleigh Works |
|
Colourful Colas! with 37175 on a Test Train and 60047 collecting the stored IWA timber wagons | |
9th November 2015 - Arlington Eastleigh Works |
|
08721 is on test, shunting the yard 73107 is on stands awaiting new wheels and overhauled traction motors The stored DMUs are shunted |
|
7th November 2015 - Twickenham |
|
Final destination and it's still raining hard! | |
7th November 2015 - Clapham Junction |
|
Half an hour at an equally wet Clapham Junction! | |
7th November 2015 - Eastleigh |
|
66114 off the rails at a very wet Eastleigh | |
3rd November 2015 - Arlington Eastleigh Works |
|
A tale of two shunters....before and after....with 08721 freshly painted and 08947 being shunted into the Paintshop to be prepped for its own repaint | |
2nd November 2015 - Arlington Eastleigh Works |
|
66565 collects DR76750 and its barrier wagon |